Pre-cast Concrete
Minimize noise, dust and waste at the construction site.
Eco-friendly PC Complex construction method
Major Structural Members of Reinforced Concrete Structure (Column, Girder, Half Slab)are manufactured in the factory and assembled on site. This eco - friendly construction method reduces environmental damage and waste generation around construction sites and greatly reduces the duration of construction.
Nature&Environment Inc., Ltd. has tMajor Structural Members of Reinforced Concrete Structurehe experience of building and installing the longest slab in Korea, which is 25 meters long.
Developement of Eco-friendly PC Complex construction methodPre-cast concrete + Reinforcement concrete
-
- Increasing the shortage of construction workers
- Less skilled technicians
- Refusing from the functional workforce 3D industry
-
- Change of Consumer's Needs
- Differentiatingly High Quality Building Needs
- No Crack / a beautiful finish
-
- Construction Environment Change
- Shortening of construction period
- No disaster
- Eco-friendly
TPMS Implementation via PC Complexity Method
TPMSTotal Project Management System
MaterialManpowerEquipment
Through Factory product (production) of field work,
it Simplifes processes and business procedures Via Just In Time supply
Cost
Innovation
-
Expected Effects
- Productivity Improvement
- Less Defects
- Short Construction Time
- Less Accidents
Expected Effects
- Construction Period : 30% less than on-site construction
- Construction Costs : Reduced Total Cost
- Field Personnel : 70% less than on-site construction
- Generation of waste : 80% less than on-site construction
- Quality improvement : Securing high quality through factory production (Fullfill Crack reduction)
- Secure safety : Less manpower and material enables disaster-free operation
Business Area
Design and structural review
- When to Construct, Design of end condition of columns and beams as simple beams
- After Construction, , design End condition with continuous beam for Continous Combined Stress.
- Improving constructability by minimizing support quantity during construction
- Ensure continuity for long-term combined stress
- Structural advantage of providing excellent connection between columns and beams with economic feasibility
Technical Application
APT Underground Parking Lot